Skip to Content

A news report prompted this multi-state, not-for-profit health system in the Northeast to review the gowns it used to ensure the community of their safety. Additionally, the system needed to align its purchasing strategy for drug-eluting stents with the needs of the physicians at its flagship hospital.

Download this case study to:

  • Learn how this health system saved $1M through appropriate drug-eluting stent, surgical drape and gown selection
  • Explore how the health system negotiated vendor pricing that exceeded their savings target by 30%
  • Understand the importance of evidence in validating the safety and efficacy of devices and  supplies